Mountrath Community School, Sports Hall & Sports Facilities

Mountrath Community School

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] Project Description: Demolish Existing School and Construct New Community School – a two storey building with 6,230 sqm of accommodation on two levels, including teaching rooms, science laboratories, construction studies/ tech drawings/ metal work laboratories, graphics & information technology labs, a physical education Hall, 5 hard court play areas and car…

Read More

Portlaoise VEC College

Portlaoise VEC College

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] Project Description: 1st Second Level School in Ireland to be Certified Airtight. The school includes high spec laboratories and, apart from the high quality building, the siteworks and utilities provided include 5 basketball / volleyball courts; the soccer pitch; a GAA game pitch and a running track, and an integral…

Read More

Caragh National School, Caragh, Naas, Co. Kildare

Caragh National School

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: The demolition of the eastern/road side section of the school. The erection of 3 no. single storey prefabricated units at rear of school, containing 6 no. classrooms with ensuite toilets together with one no. temporary services unit and associated site works to serve as temporary accommodation during the construction…

Read More

OPW Decentralised Government Offices, Roscommon – Fit-out

OPW Decentralised Government Offices, Roscommon

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] Project Description: Design & Build contract won in a Government D&B Competition for decentralised government offices in Roscommon, a Design/ Build competition promoted by the OPW, to procure new offices for the Property Registration Authority, on a site close to the centre of Roscommon Town. 3 Storey Office Block specially…

Read More

University of Limerick Health Sciences Building – Fit-out

University of Limerick Health Sciences Building – Fit-out

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: Third Level Health Sciences Building with laboratories, occupational therapy and nurses training facilities, library, large lecture halls, restaurant, etc. From a piled highly stepped ground floor, a slab and column reinforced concrete structure is taken to a 4 storey height. Double curved, almost sinusoidal roof structure with a curved…

Read More

GMIT Internal Street Project

GMIT Internal Street Project

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: This project consists of the phased demolition of the existing link corridor and part of the administration areas, and construction, in 3 phases, of a new link which forms a widen corridor leading through the existing college campus area. The phase 1 works required a huge emphasis on coordination…

Read More

NUIG – Dangan Laboratories Refurbishment

NUIG – Dangan Laboratories

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: The Dangan Labs for NUIG entailed the refurbishment of existing laboratories with new chemical resistant furniture, flooring, complete new labs, fume hoods, gas services with stringent gas proving technologies beyond that of regulation guidelines and a complete services overhaul and renewal. It also required the installation of many other…

Read More

Galway Airport – Hangars

Galway Airport – Hangars

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: Design & Build contract for 2 New Hangars at Galway Airport. This project involved the construction of 2 no. large aircraft hangars (3,800m2) and an extension to the apron at Galway Airport. 150mm deep Marshall Asphalt was installed over a sub-base to an area that had been reduced to…

Read More

Ireland West Airport – Hanger

Ireland West Airport – Hanger

Project Description:  ” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Stewart Construction completed the modification and conversion of a large Warehouse from an Airside Cargo Handling unit into an Aircraft Hangar which also involved extension of apron and taxi way to allow the entry of aircraft to newly modified hangar. This project involved the temporary bracing of an existing…

Read More

Ballinrobe Credit Union

Ballinrobe Credit Union

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] Project Description: Build new 4 Storey Office Building – Retain Original Façade The Credit Union purchased an old stone building on Main Street Ballinrobe. The old building was totally demolished and the buildings each side had temporary flying shores installed to maintain their stability during construction of the new building.…

Read More